This project had an existing factory which required an extension to the rear of the site. Joining a new roof the existing steel cladding required an internal gutter which was made from plywood. Each gutter was laid with a torch on 2 layer system and careful attention was taken between new and old materials to ensure a watertight system.

Project Details

CONTRACTOR

Client KB Construction

SIZE

60 m2

MATERIAL

Viking General Membrane