Project Description
Nutritech International
This project had an existing factory which required an extension to the rear of the site. Joining a new roof the existing steel cladding required an internal gutter which was made from plywood. Each gutter was laid with a torch on 2 layer system and careful attention was taken between new and old materials to ensure a watertight system.
Project Details
CONTRACTOR
Client KB Construction
SIZE
60 m2
MATERIAL
Viking General Membrane